Form-D Bridges and Culverts

Sl No Name, Location, Ward No Required Length (m) present Condition Land Available for Approach road
1 Construction of RCC Bridge over Refuzi para Khal near Hospital & Badarpur Union Connected at ward no 07 in Lalmohan Paurashava 20.00 Damage Iron Bridge Yes
2 Construction of RCC Bridge Connected Aslam Panchayet road to Nowab ali Munchi road via Sub-Reg Office road & R&H Road  at ward no 01, 06 in Lalmohan Paurashava 30.00 Nill/Sako Yes
3 Construction of RCC Bridge Over Gudir Khal Connected Lalmohan Bazar at ward no 07 in Lalmohan Paurashava 19.0 Damage Iron Bridge Yes
4 Construction of RCC Bridge Over Balur Char Khal near Kalma Union Connected Lalmohan Bazar 13.1 Damage RCC Yes
5 Construction of RCC Bridge Over Kalma Khal Connected Lalmohan Paurashava Charvuta Union & R&H Road 22.0 Damage Iron Bridge Yes
6 Construction of RCC Bridge Over Lalmohan Khal Connected Fireservice Station & Lalmohan Union, R&H Road 30.0 Nill/Sako Yes
7 Construction of RCC Bridge Over Hospital Khal, Hospital Connected & Lalmohan Bazar 20.0 Nill/Sako Yes
8 Construction of Baily Bridge Over Meherganj Khal, near Madrasha connected Lalmohan Bazar Wapdah Road 30.0 Nill/Sako Yes
9 Construction of RCC Bridge Mokbul Ahmmed hang sarak Connected Lalmohan Union Road (Samu hang bari road) 20.00 Nill/Sako Yes
10 Construction of RCC Bridge Gazi bari to Momotazia GPS connecting road at ward no 12 in Lalmohan Paurashava 20.00 Nill/Sako Yes
11 Construction of RCC Road Crossing Drain/Box Culvert  Different Road in Lalmohan Paurashava (30.00 nos) 10.00 Nill/Sako Yes

লালমোহন, ভোলা

 

লালমোহন পৌরসভা কর্তৃক ২০০৮-০৯ অর্থ বছর হতে ২০১৯-২০ ইং অর্থ বছর পর্যন্ত বর্তমান সরকারের বাস্তবায়িত উন্নয়ন মূলক কাজের বিবরন


 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
01 ADP, UTIDP 2008-2009 Construction of Poura Super Market building in Moszid road of Lalmohan  Pourashava (North Block)
02 Construction of Poura Super Market building in Moszid road of Lalmohan  Pourashava (nZ South Block)
03 Construction of Poura Super Market building in Moszid road of Lalmohan  Pourashava (South Block)
04 Construction of Poura Super Market building in Moszid road of Lalmohan  Pourashava (South Block)
05 লালমোহন পৌরসভা কার্যালয়ে দেয়ালে সংযুক্ত কাঠের আলমারীম তৈরী এবং ষ্টীলের আলমারী ও র‍্যাক সরবরাহ কাজ।
06 Improvement of Mozzammel Chairman bari road and Rustam Master Colony road by BC in ward no-02 & 4 of Lalmohan Pourashava.
07 Construction of R.C.C Ghatla in Nawab Ali Hawlader bari Pond and doors & Windows in Mosque in ward no.03 of Lalmohan Pourashava.
08 Earth work in road from Sanirvar road to Lalmohan Canal in front of Samu Hawlader bari in ward no-04 at Lalmohan Pourashava.
09 Earth filling work in both sides of Arai Ani road & Samaj Kallan Samity road in ward no-04 at Lalmohan Pourashava.
10 Improvement of road from High School Galary to Hashem Bepari Bari in ward no-04 at Lalmohan Pourashava.
11 Sanitary maintenance work in Poura Office building of Lalmohan Pourashava.
12 Mobarak Ali Hang road to Gazi Bari road via Hamim Academy in ward no-07 at Lalmohan Pourashava.
13 Repairing of Public toilet beside Jannat-Ul-Ferdous Mosque in ward no-01 at Lalmohan Pourashava
14 1) Earth work in BOxy Bari road, Aslam Ponchayet Bari link road and Khal par connecting road in ward no-01 at Lalmohan Pourashava.2) Road crossing drain in Boxy Bari road in ward no-01 at Lalmohan Pourashava
15 Improvement of road from R&H road to Pally Biddut Samity Office in ward no-01 at Lalmohan Pourashava
16 HBB Pavement work in Engr. Abul Kashem Kolony in ward no-01 at Lalmohan Pourashava
17 HBB Pavement work in Rickshawala Bari road in ward no-02 at Lalmohan Pourashava
18 HBB Pavement work in Nada Bari road in ward no-02 at Lalmohan Pourashava
19 Earth work in Fena Bari road in ward no-03 at Lalmohan Pourashava
20 Earth filling work in Montaz Beparee Bari road in ward no-03 at Lalmohan Pourashava
21 HBB Pavement work in road from R&H road to Krishnapura Bari in ward no-04 at Lalmohan Pourashava
22 Earth work Gafur Chowkider Bari road in ward no-04 at Lalmohan Pourashava
23 HBB Pavement work in Khalifa Bari road in ward no-04 at Lalmohan Pourashava
24 Con’s of WBM road in Solaiman Howlader Bari in ward no-05 at Lalmohan Pourashava.
25 HBB Pavement work in Ali Reza Master Bari  and Nazir Sawdagor Bari in ward no-05 at Lalmohan Pourashava.
26 Improvement of Jalal Ahmed Master Bari road in ward no-06 at Lalmohan Pourashava
27 Improvement of connecting road and repairing  of drain beside Uttar Bazar Mosque in ward no-06 at Lalmohan Pourashava
28 লালমোহন পৌরসভার ০৪ নং ওয়ার্ড করিম রোডে সিলকোট দ্বারা জরুরী মেরামত কাজ।
29 লালমোহন পৌরসভার ০৭ নং ওয়ার্ড

জমাদার বাড়ী ও খাঁ বাড়ীর মাটির রাস্তা মেরামত এবং ড্রেইনেজ পাইপ স্থাপন কাজ।

30 Earth filling work in road from Madhu Chanda road to Hospital Gate in ward no-06 at Lalmohan Pourashava
31 Earth work in road from R&H road to Delu Araddar Bari and Hospital link road to Sultan Miah Bari  ward no-06 at Lalmohan Pourashava
32 Construction of R.C.C Ghatla in Cremition grount  ward no-06 at Lalmohan Pourashava
33 Construction of R.C.C Ghatla in Uttar Bazar Residential area in ward no-06 at Lalmohan Pourashava
34 Construction of drain from Siraj Ponchayet house to Wali Araddar house in Uttar Bazar ward no-06 at Lalmohan Pourashava
35 Repairing of Public toilet near Gazi Bari Hafizia Madrasha ward no-06 at Lalmohan Pourashava
36 Improvement of Modhu Chanda road by BC from Ch.0.00-230m in ward no-07 at Lalmohan Pourashava
37 HBB Pavement work in road from Cadhu Chanda –College Para link road to Mr Nazrul Mia Bari in ward no-07 at Lalmohan Pourashava
38 HBB Pavement work in road from College Para road to Moszid-E-Mawa in ward no-07 at Lalmohan Pourashava
39 CC Connecting road with Zamadar Bari Mosque to Ghatla in ward no-07 at Lalmohan Pourashava
40 HBB Pavement work in Ganeshpuria Bari in ward no-08 at Lalmohan Pourashava
41 HBB Pavement work in Rashid Chowkider Bari in ward no-08 at Lalmohan Pourashava
42 Repearing of Public toilet near Baytul Aman Jamme Mosque in ward no-08 at Lalmohan Pourashava
43 Earth work with Palasiding in Atar Ali Hawlader  Bari road in ward no-08 at Lalmohan Pourashava
44 Improvement of Peskar Hawla Zamay Mosque Eid Gha field by C.C in ward no-09 at Lalmohan Pourashava
45 লালমোহন পৌরসভার ৪ নং ওয়ার্ডের করিম রোড সিলকোট দ্বারা জরুরী মেরামত কাজ।
46 লালমোহন পৌরসভার ৭ নং ওয়ার্ডের জমাদার বাড়ির মাটির রাস্তা মেরামত এবং ড্রেইনেজ পাইপ স্থাপন কাজ।
২০০৮-২০০৯ ইং অর্থ বছরে মোট গৃহীত প্রকল্প = ৪৬ টি, মোট প্রাপ্ত বরাদ্দ

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
ক্রমিক নং প্রকল্পের নাম

এডিপি,ইউটি আইডিপি

অর্থ বছর

২০০৯-২০১০

বাস্তবায়িত কাজের বিবরন
০১ লালমোহন পৌরসভার ৬নং ওয়ার্ডে মেজর জসিম উদ্দিন (অবঃ), এমপির বাসার সামনে রাস্তায় WBM কাজ।

 

০২ লালমোহন পৌরসভার ৬নং ওয়ার্ডের পূর্ব নয়ানিগ্রাম জামে মসজিদের সম্প্রসারন কাজ।
০৩ লালমোহন পৌরসভার বিভিন্ন ওয়ার্ডে বৃক্ষ রোপন , পৌর অফিস চত্বরে ফুলের চারা রোপন কাজ।
০৪ লালমোহন পৌরসভার ৩নং ওয়ার্ডে শরীফ খলিফা বাড়ীর মসজিদের পাবলিক টয়লেট সংস্কার কাজ।
০৫ লালমোহন পৌরসভার ৪নং ওয়ার্ডে সাফিয়া খানম মাদ্রাসা সড়ক সিলকোট দ্বারা উন্নয়ন কাজ।
০৬ লালমোহন পৌরসভার আর এন্ড এইচ হতে সমাজ কল্যাণ সমিতি সড়ক পর্যন্ত সিলকোট দ্বারা উন্নয়ন কাজ।
০৭ লালমোহন পৌরসভার ৪নং ওয়ার্ডের সহিদ মাষ্টার বাড়ী হতে দক্ষিন দিকে স্বনির্ভর সড়ক পর্যন্ত মাটির রাস্তা মেরামত করন কাজ।
০৮ লালমোহন পৌরসভার ৬নং ওয়ার্ডে আব্বাস উদ্দিন কমিশনার এর বাড়ীর সামনের রাস্তা সিলকোট দ্বারা উন্নয়ন কাজ।

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
01 এডিপি,ইউটি আইডিপি ২০১০-২০১১ Improvement of Soling road in Moijuddin Hang road in ward no-01 at Lalmohan Pourashava. (Ch-210m-390m).
02 Improvement of WBM road from Anichal Patwary bari to Moizuddin Hang Bari in ward no-01 at Lalmohan Pourashava (Ch-00m-210m).
03 Improvement of Earth filing work Mofiz Uddin Hang Bari  road to back side of Munsi Bari & Dalal Bari in ward no-01 at Lalmohan Pourashava
04 Construction of Sanitary Latrine with two Urinal in front of Shahabajpur Govt College Badda Pole in ward no-01 at Lalmohan Pourashava.
05 Improvement of road R&H to North East Pourashava border at Ch-0.00m-510m in ward no01 at Lalmohan Pourashava. (Sub Reg. Off
06 Improvement of Soling road from Nada Bari road in ward no-02 at Lalmohan Pourashava (Ch-130m-430m)
07 Maintance of HBB road from Womens College road in ward no-02 at Lalmohan Pourashava .
08 Improvement of WBM road of Balurchar road to Nada Bari in ward no-02 at Lalmohan Pourashava
09 Maintance of Hashan Hang road by B/C in ward no-02 at Lalmohan Pourashava
10 Construction of Passenger shade & R.C.C Slab in front of T&T in ward no -02 at Lalmohan Pourashava
11 Improvement of Earth filling work Ponchayet Bari road to Salim Ponchayet house in ward no-02 at Lalmohan Pourashava
12 Improvement of HBB Pavement work in Kartar Kachary B/C road to Islam Munchi Bari road in ward no-03 at Lalmohan Pourashava
13 Improvement of HBB Pavement work in Kartar Katchary B/C road to Mantaz Bapary Bari road in ward no-03 at Lalmohan Pourashava
14 Improvement of Soling road from Ari-Ani B/C road to Pandit house via Mowlobi Bari and Daira Sharif Mosque road in ward no-03 at Lalmohan Pourashava (Ch-00m-405+Ch00m-115m)
15 Improvement of Earth filling work Poura Reg School to T&T Kamal house road (Ch-0.00m-450m) in ward no-03 at Lalmohan Pourashava
16 Improvement of HBB Pavement work in Kartar Kachary B/C road to Fena Bari road in ward no-03 at Lalmohan Pourashava
17 Improvement of Earth filling work Mokbal Hang road to Ari-Ani road in ward no -04 at Lalmohan Pourashava (Ch-00m-420m)
18 Improvement of Soling work Shanirvar road to Sohid Hang Bari road in ward no-05 at Lalmohan Pourashava
19 Improvement of HBB road East side of Fire Service Station in ward no-05 at Lalmohan Pourashava
20 Painting work of Existing Poura Bhaban by Colouring ward no- at Lalmohan Pourashava 06

 

 

 

 

21       Improvement of WBM road Baitur-Redayon-Mosque front side to South Bazzar Stall in ward no- 06 at Lalmohan Pourashava.
22 Improvement of Uttor Bazzar Stall (South side East Stall) in ward no- 06 at Lalmohan Pourashava.
23 Improvement of Uttor Bazzar Stall (South side Middle Stall) in ward no- 06 at Lalmohan Pourashava.
24 Improvement of Uttor Bazzar Stall (South side West Stall) in ward no- 06 at Lalmohan Pourashava.
25 Improvement of Uttor Bazzar Stall (North side East Stall) in ward no- 06 at Lalmohan Pourashava.
26 Improvement of Uttor Bazzar Stall (North side Middle Stall) in ward no- 06 at Lalmohan Pourashava.
27 Improvement of Uttor Bazzar Stall (North side West Stall) in ward no- 06 at Lalmohan Pourashava.
28 Improvement of Uttor Bazzar South side Stall near South side road in ward no- 06 at Lalmohan Pourashava.
29 Improvement of Chandra Para C.C road in ward no-06 at Lalmohan Pourashava
30 Cons. of Passenger Shade & 2 Stalls in Launch Ghat at Lalmohan Pourashava
31 HBB Pavement work in road from College Link road to Bazrul Mia Bari in ward no-07 at Lalmohan Pourashava
32 Improvement of Uttor Bazzar Bridge to Modhu Chanda road in ward no-07 at Lalmohan Pourashava
33 Improvement of Soling work Zannatul Mawya Zama-Mosque to Collegiate School in ward no-07 at Lalmohan Pourashava
34 Improvement of Aziz Pondit Sarak in ward no-07 at Lalmohan Pourashava
35 Improvement of Earth filling work Gazi Bari Link road North Direction in ward no-07 at Lalmohan Pourashava
36 (1) Improvement Hawlader road to Jalla Para link road in ward no-08 at Lalmohan Pourashava (2) Road crossing drain from Hawlader road to Jalla Para link road in ward no-08 at Lalmohan Pourashava
37 Improvement of Soling road from Mozammal road to Monju Mia house in ward no-09 at Lalmohan Pourashava
38 Maintenance of Motahar Uddin road  in ward no-09 at Lalmohan Pourashava
39 Improvement of Earth filling work Vumi-Hin Culvert to Nasir Shop via Ramiz Member Bari road in ward no-09 at Lalmohan Pourashava
40 Akhra Bari Protection Gate
41 Supplying Electric Goods for Streght light in Lalmohan Pourashava.
42 Imergency Maintenance of Lalmohan Bazzar in ward no-06 at Lalmohan Pourashava.
43 Improvement of Emergency repairing work in Karim road from Ch.592.00m to Ch.912.00m by Seal coat in ward no-04 at Lalmohan Pourashava.
44 Estimate for RCC slab & RCC Drainage Pipe Laying different Place of Lalmohan Pourashava.

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
01 IUIDP/LGD 01/ 2011-2012 Balurchar BC road to Anichal patawari bc road ward no 01 at Lalmohan pourashava
02 05/2011-2012 Lalmohan Fulbagicha bc road to Kartar kachary bc road (Sanirvar sarak) in ward no 03/04 at Lalmohan Pourashava
03 Lalmohan Bazar Chowmatha to Binodon hall BC road in ward no 06 at Lalmohan Pourashava
04 ADP 01/2011-2012 Construction of Mosque at Samsul Ulum Jama Mosque in ward  no-06 at Lalmohan Pourashava.
05 Construction of road & Park development area near in front of Shabajpur Govt College
06 Improvement of Earth filling work from Collegiate GPS to Poura Boundary in ward no-06 at Lalmohan Pourashava
07 Improvement of Earth filling work from Hospital Gate to College link road Culbart in ward no-06 at Lalmohan Pourashava
08 Construction of R.C.C road from Binodon Hall to Kishori Kundo Shop road in ward no-06 at Lalmohan Pourashava
09 Construction of R.C.C Deck Culvert on the North side of Hospital Canal in ward no-06 at Lalmohan Pourashava
10 Construction of C.C road from Sadar road to Binodon Hall road in ward no-06 at Lalmohan Pourashava
11 Estimate for Passenger shade in front of T&T ward no-02 at Lalmohan Pourashava
12 Construction of C.C road from Ariani B.C road to Poura Reg Primary School in ward no-03 at Lalmohan Pourashava
13 Construction of C.C road from Kattar Kachary B.C road to Fena Bari in ward no-03 at Lalmohan Pourashav
14 Construction of C.C road from Nabin Para road to Chaprashi Bari in  ward no-03 at Lalmohan Pourashav
15 Construction of C.C road Kattar Chary B.C road to Mantaz Bapary Bari in ward no-03 at Lalmohan Pourashava.
16 Improvement of Earth filling work from Chaprashi Bari road to Sanirvar B.C road via Shafi house in ward no-03 at Lalmohan Pourashava
17 Construction of C.C road from Uttar Bazar Mosque to Poura Stall in ward no-06 at Lalmohan Pourashava
18 Instillation of Pipe Line start Modhu Chanda road to Uttar Bazar & Dack Bangla Bridge to Sadar road in ward no-06/07 & 07/08 Lalmohan Pourashava.
19 Improvement of Earth filling work Hospital Bridge to Manu hang house in ward no-06 at Lalmohan Pourashava
20 Construction of Public Toilet at Lalmohan Pourashava.
21 Supplying fitting fixing & Electric Pole different area of Lalmohan Pourashava.
22 Estimate of WBM road Uttar Bazar Dumping Station in ward no-06 at Lalmohan Pourashava.
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
01 ADP 01/2012-2013 Const Ghatla at Shasan & Kasai khana at ward 06
02     Extenction of kasai khana house at ward 06
03 Const Malbari Mosque Public Toilet
04 Aslam Ponchayet Mosque Public Toilet
05 Const Akhra bari Asram
06 Const of HBB road Bagha bari at w 07
07 Dev work Pourashava Square
08 Const Uttar bazar Stall at w 06
09 Earth filling work in front of Solaiman patwari house to Malek mia culvert at w 09
10 Earth filling work Motahar uddin road to Malek mia bari at w 09
11 Const BC road Jamadar bari-Jouban ali hang bari
12 Const of Notun bari CC road w 02
13 Earth filling work Faruk Doctor bari to BRDB Slum w 08
14 Semi Pucca graze at Lalmohan Pourashava
15 Reparing water line Lickage at Different ward
16 Const of Public Toilet Mobarak ali Hang Mosque
17 const of Drain slab Lalmohan Bazar w 06
18 Earth filling work Nazirpur road to Abdul Haque house wo 08
19 Earth filling wori nasir ahmad kari bari w 08
20 Reparing HBB road Solaiman hang bari & Soyod hang bari wa 05
21 Re-Const of WBM road Mohazone potty & Motahar Uddin sarak w 06/09
22 Const of HBB road Jele para to Hang para w 08
01 IUIDP 02/2012-2013 Cosnt of RCC road start from Dackbangla bridge to Ponchayet culvert via Pump house 02 in front of Poura Bhaban in ward no 02/06
         
01 UGIIP-11 03/2012-13 Construction of Road starting from Bhola-Charfashion (R&H) road to BOxy Bari road by Bituminus carpeting (Ch0.00m-410.00m)
Re-construction of road starting from Zannatul Ferdous Mosque road to Moizuddin Hawlader road by Bituminus carpeting . (Ch 0.00m-540.00m)
Re-construction of road starting from Lalmohan Mongal Sikder Sarak to Riksala bari by Bituminus carpeting. (Ch00-276m) & Const of 02 Nos Crossing Drain
Improvement of Road starting from R&H to Bazlu Sir house (Ch0.00-420) in front of Sabujbag by B.C & Const of 03 Nos of Cross Drain.
Construction of road Starting from Ariani B.C road to Poura Reg. School by Bituminus carpeting (Ch00-628.00m) & Const of 01 No of Cross Drain.
Construction of road Starting from Shabaspur College road to Hospital gate. (Ch-0.00m-530.00m)

 

 

        Construction of road Starting from Ariani B.C road to Poura Reg. School by Bituminus carpeting (Ch00-628.00m) & Const of 01 No of Cross Drain.
Construction of road Starting from Shabaspur College road to Hospital gate. (Ch-0.00m-530.00m)
Re-construction of Mohajon Potty Sarak by RCC of length 85.00m (both sides) and by BC of length 563.00m
Improvement of road starting from Motahar Uddin road to Mojammal road via Malek shop by B.C & Const of 01 no. of Crossing Drain(Ch.0.00-1100.00m)
 

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
01 ADP LTM 01/2013-14 Cosnt of Eidgah Toilet
02 Improvement of Graveyard, Shasan & Sree Sree Loknath Brakhmman Mondir ward 06
03 Impv of go hatti ward no 06
04 UGIIP -11 OTM 01/2013-14 Improv of Katcha bazar road ot Surma Saw mill road in ward 06
05 Re-Const of road North side of Uttar bazar Mosque road
06 Modhu Chand warak to Sahbajpur College sarak wo 07
07 Hamim Academi Sarak wa 07
08 Lalmohan Mongal Sarak to Sanirvar sarak wa 03
09 Const of BC road Uttar Bazar Bridge to Razzak Ponchayet shop ward 06
10 Lalmohan Launch Ghat Sarak ward 06
11 Mobarak ali Hang sarak by BC
01 UGIIP -11 OTM 03/2013-14 Cosnt of Abul Hossain mia Sarak by BC
02 Cosnt of Zannat Ul Ferdous road
03 Cosnt of Korim road by BC
04 Cosnt of Collegiate School road by RCC
05 Bornali sarak by Bc
06 Jamadar bari road by BC
01 ADP OTM 04/2013-14 Earth filling work Nur Islam house to Faruk Prof house
02 Earth filling work Moizuding hang bari road to Kobir house
03 Earth filling work Sanirvar sarak to Poura border via Khalek Commandar bari
04 Earth filling work Mizi bari road to North side of khal
05 Earth filling work Balayet kha bari to east side khal
06 Earth filling work College parak sarak to North direction of Zannat ul Mowa Jamme Mosqe 
07 Earth filling work Boxi bari road to south side of Cannal
08 Earth filling work Jamadar bari road Refuzi para sarak
09 Earth filling work start from Hang bari connecting road w 02
10 Earth filling work start form Poura Reg school sarak to Cannu Ponchayet sarak ward 03

 

11       Earth filling work start from Baluchar road to (Seker dokan) to rofik mia bari ward no 08
12 Earth filling work start from City Cell Tower road to East side of khal ward no 08
13 Earth filling work start from Joynal Abdin Patwari bari to Bachu Dalal bari ward no 04
14 Earth filling work start from Fozle rahman hang bari to rofik miar bari  ward no 05
15 Earth filling work start from Zannat Ul Ferdous Mosque road to North side Nada bari war no 01/02
16 Earth filling work start from Gucha gram to South side of Cannal ward no 06
17 Earth filling work start from
18 Cosnt of Semi Pucca Bhaban Poura Karmachary Sangsad  at ward n06
19 Const of RCC Ghatla at the Pond Jamada bari Pond ward no 07
20 Earth filling work start from Nazirpur BC road to Munchi bari, Jouban ali & Uttar Peskar Hawla School sarak ward no 08
21 Earth filling work start from Nazirpur BC sarak to Rohim mia house  in ward no 08
22 RCC Box Culvert College para link road ward 07
23 RCC Ghatla Srang bari Mosque ward no 03
24 RCC Ghatla in front of Nada bari ward no 02
25 Const of RCC road Azizi Dala bari, Dorbesh poter barai ward no 01
26 Rcc work Montaz bepari bari sarak ward no 03
27 Earth filling work Zannat Ferdous Mosque to North side nada bari in ward no 01/02
28 Const of Hasan hang bari sarka by BC
29 Earth filling work North side of Nada bari ward 02
30 RCC Ghatla Ponchayet bari Pond ward no 02
01 PPNB OTM 05/2013-14 Sahbajpur College sarak by BC ward no 07
02 Re-Const of hang sarak ward no 07
03 Re-Const of Sabuj bag road ward no 05
04 Re-Const of Tersi Pool Sarak ward no 06
05 Cosnt of Rcc road Hospital Gate to Manu hang bari via Modhu Chanda sarak ward no 6/7
06 Re-Const of BC road Samaj Collan  Somity sarak ward no 04
07 Rcc Ghatla Different ward at Lalmohan  Pourahsava
08 Ponchayet bari road by BC & Rcc  U Drain
09 Const of U Drain Korshed mia bari to Ojufa Khatu house wrad no 02
10 Const of Rcc U drain & BC road Binodo Cinama hall Chowmatha ward no 06
11 Const of Rcc U Drain start form Malek mia shop to Mokles mia house ward no 04
12 Improvement of Poura Sisu Park
13 Cosnt Poura Sisu park Approach road, Walk Way & Gate
14 Re-Const of Master para road by BC ward no 06
15 Const of road start form Hospital Gate to Manu hang bari (rest portion)
 

01

IUIDP OTM 06/2013-14 Part-01 Re-Const of Motahar Uddin sarak to Peskar Hawla GPS & Different link road ward no 09

part-02 Cosnt of Road Crossing Drain (2 nos )

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
01 IUIDP OTM 01/2014-15 Construction of RCC & B.C Road in Different area at Lalmohan Paurashava.
02 ADP LTM-01/2014-15 Improvement of Ahmad mia shah Central Eidgah in ward no-08 at Lalmohan Pourashava.
03 DPHE Projet (Thana Sadar Growth Center Pipe Line Netwark) OTM-03/2014-15 Construction of sinking 30 (thirty) nos Deep Tube well different ward at Lalmohan Pourashava.
04 IUIDP OTM-04/2014-15 Re-Construction of MP house Sarak, Ahamed Sha sarak, Hasem bapary bari, hanif hawlader & hamid hawlader sarak by BC & RCC at Lalmohan Pourashava (Ch 0.00m-990.00m)
05 BCCTF OTM-05/2014-15 1. Construction of RCC `U’ Drain Start from Mia bari to Fazlu Master bari via Maolana saheb bari in ward no-08 at Lalmohan Pourashava (Ch 0.00m-370)

 

2. Construction of RCC `U’ Drain start from Bagan bari to Riksawala bari Cannel in ward no 02 at Lalmohan Pourashava. (Ch 0.00m-280m)

 

3. Construction of RCC `U’ Drain start from Zannat-UL-Ferdous Mosque to West side of Canal in ward no-02 at Lalmohan Pourshava. (Ch 0.00m-382.00m

 

4. Construction of `U’ Drain start from Daira Sharif Zame Mosque to Pakar matha Canal via A.Kader bari in ward no-02/03 at Lalmohan Pourashava. (Ch 0.00m-700.00m)

 

01 IUIDP OTM-06/2014-15 Re-Const of Motahar Uddin Sarak to Peskar Hawla GPS

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
01 ADP OTM 01/2015-16 Construction &  Re – C0nstruction of Soling Flat Form in M.P. House in Ward no – 06.at Lalmohan Pourashava.
02 Improvement of Earth filling work start from Munchi Bari Road to North direction of Cannal via Sub- Reg:office in ward no – 01.at lalmohan Pourashava.
03 Construction of HBB road start from Nazirpur BC road to South side of Cannal (ch.0.00m-99.00mm) in ward no :08 at Lalmohan pourashava.

 

04       Construction of RCC road Mobarak Ali Hang  sarak Baitul Aman Mosque,Zannat- ul-Mawa Mosque road  in ward  no.07/08. at Lalmohan Pourashava.(Ch.0.00m-170.00m)
05 Replacement of Street Light at Lalmohan Pourashava.
06 Re-construction of BC road start from Jalay Para road to Mobarak Ali Hawlader BC road ch.(110.00m-148.00m)=38.00m & Sanirvar road ch.(370.00m-420.00m)=50.00m in ward no-08/05.at Lalmohan Pourashava.
07 Supplying Varities Stationary Goods at Lalmohan Pourashava
08 Beautification work for Pond  adjacent Shabajpur Govt College field by footpath east under Lalmohan  Pourashava. Part-01
09 Beautification work for Pond  adjacent Shabajpur Govt College field by footpath east under Lalmohan  Pourashava. Part-02
10 Construction of  Aha Med  Mia Sha Central Eidgah U drain, Boundary wall, wall & Roof Tiles.l  Western Para  ward no – 08 at Lalmohan Pourashava.
11 Construction of Retaining Wall Sahabajpur Govt College Pond (South side) ward no-06 at Lalmohan Pourashava.
12 Re-Construction of Munchi bari road in ward no-01 at Lalmohan Pourashava
13 Construction of Beautification  work (Foara) Sahbajpur Govt College Pond in ward no-06 at Lalmohan Pourashava
14 Construction of R.C.C Box Culvert College para Link road in ward no-07 at Lalmohan  Pourashava.

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
01 ADP OTM 02/2015-16

(Package no Lal/Paura/2015/01)

·         Construction of RCC road Natun Bari in ward no – 02,at Lalmohan Pourashava.(Ch.0.00m-40.00m)

·         Construction of RCC road Abdurrob Maker Bari in ward no – 02,at Lalmohan Pourashava.(Ch.0.00m-60.00m)

·         Construction of RCC road Abdul Haque  Hajari Barii in ward no – 02,at Lalmohan Pourashava.(Ch.0.00m-115.00m)

·         Construction of RCC road Gani Munchi  Bari,  Habib Mohori Bari in ward no – 02,at Lalmohan Pourashava. (ch.0.00m-40,0.00m-30.00m)

·         Construction of RCC road  Nada  Bari in ward no – 02,at Lalmohan Pourashava.(Ch.0.00m-182.00m)

·         Construction of Grave yard Boundary inside Bagan bari  in ward no-02 at  Lalmohan Paurashava

    Package no Lal/Paura/2015/02   ·         Construction of RCC road Abul Hasem Councilor Bari in ward no – 09,at Lalmohan Pourashava.(Ch.0.00m-125.00m)

·         Construction of RCC road Miazi Bari in ward no – 09,at Lalmohan Pourashava.(Ch.0.00m-125.00m)

·         Construction of RCC road Rahmat Mia  Bari in ward no – 09,at Lalmohan Pourashava.(Ch.0.00m-115.00m)

·         Construction of RCC road Ali Ahamed Master  Bari in ward no – 09, at Lalmohan Pourashava.(Ch.0.00m-85.00m)

·         Construction of RCC road Vumihin sarak to Rafik Bari in ward no- 09 ,  at Lalmohan Pourashava.(Ch.0.00m-110.00m)

·         Construction of RCC road Samu Patwary Bari in ward no – 09,at Lalmohan Pourashava.(Ch.0.00m-90.00m)

·         Construction of RCC road Dally Bari in ward no – 09,at Lalmohan Pourashava.(Ch.0.00m-62.00m)

·         Construction of RCC road Easak Fakir Bari in ward no – 03,at Lalmohan Pourashava. (Ch.0.00m-80.00m)

·         Re- construction of BC road start from Balour Char  road to Anichal Patwary bari  BC road in ward no 01 at lalmohan pourashava. (ch.0.00m- 306.00m)

·         Construction of RCC road Start from Munchi bari to Hazari bari via Darbesh Putrer Bari in ward no – 01,at LalmohanPourashava. (ch.0.00m-320.00m).

·         Construction of Road crossing Drain Dorbesh putrer bari in ward no-01 at  Lalmohan Pourashava

 

    Package no Lal/Paura/2015/03   Improvement of Sand Filling Work Lalmohan Paura Shisu Park( Part 1,2,3,4,5).
    Package no Lal/Paura/2015/04   ·         Improvement of Sand filling work small Pond Infront of Govt Shabajpur College in ward no – 06 at Lalmohan Pourashava

·         Improvement of Earth filling work Start from Balourchar Bc road to Golder Bari Zamae Mosque. (ch.70.00m-145.00m.ch.200.00m-220.00m)new Area at Lalmohan Pourashava.

·         Improvement of Earth filling work Start from Karamat Ali Madrasha to Boxi Bari Sarak. (ch.45.00m-90.00.00m.ch.240.00m-270.00m)new Area at Lalmohan Pourashava.

·         Street Lighting & Line extension in new area (Proposed ward no10,11,12) at Lalmohan Paurashava.

·         Construction of Cross Drain In front of Ali Ahammed Bepari house in ward no-08 at Lalmohan Paurashava.

·         Improvement of Earth Filling Work Walk-Way Garden side & South side Earthen road at Shabajpur College Play Ground in ward no-06 at Lalmohan Paurashava.

·          Construction of Walk-Way Brick work Shabajpur Govt College Play Ground word no-06 at Lalmohan Paurashava

·         Construction of Existing Walk-Way Shabajpur Govt College Play  Ground ward no-06 at Lalmohan Paurashava

ক্রমিক নং প্রকল্পের নাম বাস্তবায়িত কাজের বিবরন
  ADP OTM 03/2015-16  
01       Construction of RCC road  Gazi Jamadar bari & Haris Jamadar bari in ward no07 at Lalmohan Paurashava.
02 Construction of RCC Work Nazir Ahamed Hawlader Sarak  in ward no – 07,at Lalmohan Pourashava.(Ch.0.00m-240.00m)
03 Construction of BC road start from Gazi Bari road to GudirPool Bridge in ward no – 07.at Lalmohan Pourashava.(Ch.0.00m-460.00m)
04   Construction of RCC road Start from R&H road to Aslam ponchyet & Tipu ponchayet Bari in ward no – 01/07,at Lalmohan Pourashava.(ch.0.00m-356.00m).
05 Construction of BC road start from Zamadar bari road to Refuji para road  in ward no – 07.at Lalmohan Pourashava.(Ch.0.00m-410.00m)
06 Construction of RCC road Rashid Chokedar Bari in ward no – 08,at Lalmohan Pourashava.(Ch.0.00m-115.00m)
07 Construction of RCC road Start from   Nazir pur BC road to AFTAR Ali Hawlader Bari in ward no – 08,at Lalmohan Pourashava.(ch.0.00m-75.00m).
08 Construction of RCC road Dactarbari,,Hajir poter bari,Asmat Kashi bari,Anichal mia bari sarak in ward no – 04,at Lalmohan Pourashava.(Ch.0.00m-410.00m)
09 Construction of Palisiding work Nayani gram Mosque pond & Abul Hasem Bapary Bari Sarak in ward no – 04 at Lalmohan Pourashava.
10 Construction of RCC road Start from Karim road to Chakeder Bari in ward no – 04,at Lalmohan Pourashava.

(ch.0.00m-120,00m).

11 Construction of Road crossing Drain Different road at Lalmohan Pourashava. (02 Nos)
12 Construction of RCC road Start from Safia Khanom  Madrasha road to Abdus Sahid Master Bari in ward no – 04,at Lalmohan Pourashava.(ch.0.00m-106.00m).
13 Construction of Noyani Gram Paura Eidgah field ward no-04 at Lalmohan Paurashava.
14 Construction of RCC road Start fromAbul Hossain Mia sarak to Abul Hasem Chu Bari in ward no – 04,at Lalmohan Pourashava.(ch.0.00m-280.00m).
15 Construction of RCC road Start from Samajkallan Samity Sarak to Late Shahajahan Kudus  Bari, Ratan miar Bari  in ward no – 04/05 ,at Lalmohan Pourashava.(ch.0.00m-50.00m, 0.00m-43.00m).
16 Improvement of Sand filling work Govt Shahabajpur College Play Ground in ward no – 06 at Lalmohan Pourashava.
17 Construction of RCC road Start from Kartar katchary BC road to Islam Munchi  Bari in ward no – 03,at Lalmohan Pourashava.(Ch.0.00m-185.00m).
18       Construction of RCC road Noor Mohammed Chaprashi  Bari in ward no – 03,at Lalmohan Pourashava.

(ch.0.00m-105,00m)

19 Construction of RCC road Start from Ponchayet bari road to East side of Baschu Ponchayet house I in ward no – 2 at Lalmohan Pourashava.(ch.0.00m-60.00m).
20 Construction of RCC road Start fromZannat – Ul – Ferdous Mosque sarak toSarang  Bari in ward no – 01,at Lalmohan Pourashava.(ch.0.00m-210.00m).
21 Construction of RCC road Start from Moizuddin Hang Sarak to Dalal  Bari in ward no – 01,at Lalmohan Pourashava.(Ch.0.00m-190.00m)
22 Construction of RCC road Start from R&H road to Munchi Barii in ward no – 01,at Lalmohan Pourashava.(Ch.0.00m-75.00m)
23 Construction of BC road start from Nowab Ali Hang road to Ohid Master Bari in ward no – 03.at Lalmohan Pourashava.(Ch.0.00m-390.00m)
24 Construction of RCC road Dulamia Hang  Bari in ward no – 09,at Lalmohan Pourashava.(Ch.0.00m- 41.00m)
25 Construction of RCC road Lutfor Rahman Patwaryi Bari in ward no – 09,at Lalmohan Pourashava.(Ch.0.00m-140.00m)
26    Construction of RCC road Dattapara in ward no – 06, at Lalmohan Pourashava.(Ch.0.00m-46.00m)
27 Construction of RCC Road Crossing Drain Different road at Lalmohan Paurashava
28 Construction of Bricks  Road crossing Drain Different road at Lalmohan Pourashava. (02 Nos)
29 Construction of RCC Road Mugbul Ahmad Mowlobi bari in ward no-03 at Lalmohan Paurashava (Ch 0.00m-115.00m)
30 Construction of RCC Road start  from Sanirvar road to Khalak Commender bari in ward no-03 at Lalmohan Paurashava (Ch 0.00m-141.00m)
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
01 BCCTF OTM 04/2015-16 Construction of RCC `U’ Drain Start from Badsha mia Academi to Sout side of Cannel in ward no-02 at Lalmohan Pourashava (Ch 0.00m-162m)
02 Construction of RCC `U’ Drain start from Safia khanam Madrasha to back side Yunus Master bari Cannel in ward no 04 at Lalmohan Pourashava. (Ch 0.00m-430m)
03 Construction of RCC `U’ Drain start from Modhu Chanda sarak to back side of Mobarak ali hang bari in ward no-07 at Lalmohan Pourshava. (Ch 0.00m-75.00m)
04 Construction of RCC `U’ Drain start from Shabajpur College to North side of Cannel at Lalmohan Pourshava. (Ch 0.00m-60.00m)

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
01 ADP OTM 05/2015-16 Construction of RCC road start from Samaj Kallan Somity sarak to Moffazzal Mia bari sarak in ward no-05 at Lalmohan Pourashava (Ch 0.00m-86.00m).
02       Shabajpur Govt College road extantion work RCC road in ward no07 at Lalmohan Pourashava
03 Const of Mehrab in Ahmad Sah Central Eidgah in ward no 08 at Lalmohan Pourashava.
04 Constructionof RCC Ghatla at the Pond of Mojibur Rahman Ponchayet bari in ward no 02 at Lalmohan Pourashava (West Pond)
05 Constructionof RCC Ghatla at the Pond of Mojibur Rahman Ponchayet bari in ward no 02 at Lalmohan Pourashava (East Pond)
06 Construction of RCC road Thanar Mor in ward no 04 at Lalmohan Pourashava .
07 a) Construction of Poura Market Building in Poura Pump   no-02 north side  (Part-01,02,03) 1st floor at    Lalmohan Pourashava
08 Const of Sahbajpur Govt College field Beautification work ward no 07
09 Re-Const of Upazilla Complex road by BC ward 05
10 Construction of R.C.C road Amir Hamja Dalal bari in ward no 03
11 Construction of R.C.C road Cross Drain in front of Mofazzal mia bari ward no 05
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  BCCTF OTM 01/2016-17
01        Construction of RCC U Drain start from Est side of R&H road  Existing Drain to Safiullah Mia bari in ward no-05 at Lalmohan Paurashava (Ch 0.00m-154.00m)
02  Construction of RCC U Drain start from Sabuj Bag sarak to West side of Khali in ward no-05 at Lalmohan Paurashava (Ch 0.00m-35.00m)
03  Construction of RCC U Drain start from Sabuj Bag  Prof. Bazlur Rahman  House  sarak to west side of Cannal  in ward no-05 at Lalmohan Paurashava(Ch 0.00m-154.00m)
04 Earth Cutting/Cannal Digging  for Lalmohan Khal in ward no-8/9 at Lalmohan Pourashava.(Ch.0.00m-800.00m)
05 Improvement of Khal par Protection work (Graveyard North Side) in ward no – 06, at Lalmohan Pourashava.
06 Construction of Lalmohan Poura Shisu park (footpath East) Ward no-12 at Lalmohan Pourashava.
07 Construction of Retaining wall  Lalmohan  Poura Shisu Park pond (near Ghatla)Ward no-12 at Lalmohan Pourashava.
  LMIDP OTM 02/2016-17, 03/2016-17  
01       Improvement of Road start from  Motahar Uddin Sarak- Solayman Patwary Bari Sarak via. Nazirpur road to south side of Canal in  Ward no-8 at  Lalmohan Pourashava.(Ch.0.00m-1450.00m).
02 Improvement of  Road from Ahmed Shah Sarak- Modhu Chand Sarak (Ch 0.00m-580.0m)  in ward no-08 at Lalmohan Paurashava
03   Improvement of  Road  Bokshi bari –  BalurChar  Road  in ward no – 11 at Lalmohan Pourashava.(Ch.410.00m-1850.00m) with 2 nos road crossing Culvert.
04 Improvement of Road  Poura Gate –  Charsokina Culvert road  in ward no – 10 at Lalmohan Pourashava.(Ch.500.00m-900.00m)
05 Improvement of Road from Ahmad Sah Sarak – Mobarak ali Hawlader Sarak (Ch 0.00m-604.00m)  in ward no-08 at Lalmohan Paurashava.
06 Improvement of Road  Ahmad Sah Sarak – Mobarak ali hang Sarak (Ch 0.00m-255.0m)  in ward no-08 at Lalmohan Paurashava
07 Improvement of Road from Bhanga Pool to Munchibari Sarak via. Momotazia GPS in ward no 12at Lalmohan Pourashava.
08       Improvement of Road from Balurchar road-Golder bari Sarak  in ward no 12at Lalmohan Pourashava
09       Improvement of Road from Balurchar road-Golder bari Mosque  in ward no 10at Lalmohan Pourashava
10       Construction of Loading and unloading platform cum Truck Stand Lalmohan Bazar Chowrasta Hafijuddin avenue to Akhra bari gate ward no-06 (Two Lane)under Lalmohan Pourashava .(ch.0.00m-356.00m).
11        
12       Construction of Shugondha road Bridge over Lalmohan Khal at Lalmohan Pourashava
13       Construction of Bazlur Rahman Sarak to ward no 09 Connecting Bridge at Lalmohan Pourashava
14       Construction of Jamader road to Refugee Para Connecting Bridge at Lalmohan Pourashava
15       Improvement of Master Drain Pump house no 2 in front of Hospital Canal in ward no 06 at Lalmohan Pourashava
16       Cosntruction of Drain with foot path in Lalmohan Poura Area
 
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  ADP OTM 04/2016-17  
01       Construction of Road Crossing Drain Boxi bari to Balurchar road in ward no 11 at Lalmohan Pourashava (02 Nos)
02       Vertical extension of Poura Bhaban 2nd Floor at Lalmohan Pourashava
03       Construction of Road Crossing Drain Motahar Uddin Sarak to Solayman patwary Sarak in ward no 08 at Lalmohan Pourashava (01 Nos)
04       Construction of  RCC road Start from R&H road to Krisnapura Bari in ward no 04 at Lalmohan Pourashava (Ch 0.00m-70.00m)
05       Clearing and grubbing by removal and disposal of RCC U Drain & Improvement of Katcha Drain in ward no 04/05 at Lalmohan Pourashava
06       Construction of Road Crossing Drain Salim prof Home road in ward no 08 at Lalmohan Pourashava (01 Nos)
 
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  LMIDP OTM 01/2017-18
01         Construction of 32.00m Long Arch Bridge on Lalmohan Katcha Bazar road
02 Construction of Multipurpose Market beside RHD road from pump no-2 to Hospital Bridge
03 Construction of Kitchen Market at Uttar Bazar (2 nos)
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  BCCTF (3rd phase) OTM 02/2017-18
01       Construction of RCC U Drain start from R&H road culvert to Parvin Dulal House via Julfikar mia Market in ward no-01 at Lalmohan Pourashava (Ch 0.00m-160.00m)
02       Construction of RCC U Drain start from Jannatul Ferdous Mosque to Mintu Mia House via Back side of Ofdha Office in ward no-01 at Lalmohan Pourashava (Ch 0.00m-270.00m)
03       Construction of RCC U Drain start from Kasai Khana to existing Drain West & East side North Bazar in ward no-06 at Lalmohan Pourashava (Ch 0.00m-42.00m+38.00m+9.00m =  89.00m
04       Construction of  BC road start from Sanirvar sarak to Sakawat hang bari in ward no-05 at Lalmohan Pourashava (Ch 0.00m-360.00m)
05       Construction of RCC road start from Zannat-Ul-Ferdous Mosque to MRS Parvin Dulal house in ward no-01 at Lalmohan Pourashava (Ch 0.00m-205.00m)
06       Construction of  RCC  D rain in front of  Dag bangla Bridge to West direction at Nazirpur road (Ch 0.00m-350.00m) at Lalmohan Pourashava
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  ADP 2017-18
01       Shabajpur Govt College road extantion work RCC road in ward no07 at Lalmohan Pourashava
02       Construction of RCC & B.C Road in Different area at Lalmohan Paurashava.
03       Construction of  RCC road Start from R&H road to Krisnapura Bari in ward no 04 at Lalmohan Pourashava (Ch 0.00m-70.00m)
04       Construction of Mobarak ali hagn sarak in ward no 07 at
05       Construction of RCC road Dactarbari,,Hajir poter bari,Asmat Kashi bari,Anichal mia bari sarak in ward no – 04,at Lalmohan Pourashava.(Ch.0.00m-410.00m)
06       Construction of RCC road Start from Moizuddin Hang Sarak to Dalal  Bari in ward no – 01,at Lalmohan Pourashava.(Ch.0.00m-190.00m)
07       Construction of Noyani Gram Paura Eidgah field ward no-04 at Lalmohan Paurashava.
08       Construction of RCC road Start fromZannat – Ul – Ferdous Mosque sarak toSarang  Bari in ward no – 01,at Lalmohan Pourashava.(ch.0.00m-210.00m).
09       Construction of RCC road Noor Mohammed Chaprashi  Bari in ward no – 03,at Lalmohan Pourashava.

(ch.0.00m-105,00m)

10       Construction of RCC Work Nazir Ahamed Hawlader Sarak  in ward no – 07,at Lalmohan Pourashava.(Ch.0.00m-240.00m)
11       Construction of RCC road Start from R&H road to Aslam ponchyet & Tipu ponchayet Bari in ward no – 01/07,at Lalmohan Pourashava.(ch.0.00m-356.00m).
12       Construction of RCC road Start fromAbul Hossain Mia sarak to Abul Hasem Chu Bari in ward no – 04,at Lalmohan Pourashava.(ch.0.00m-280.00m).
13       Construction of BC road start from Gazi Bari road to GudirPool Bridge in ward no – 07.at Lalmohan Pourashava.(Ch.0.00m-460.00m)
14       Construction of RCC road Start from Karim road to Chakeder Bari in ward no – 04,at Lalmohan Pourashava.

(ch.0.00m-120,00m).

15       Construction of RCC road Start from Kartar katchary BC road to Islam Munchi  Bari in ward no -03,at Lalmohan Pourashava.(Ch.0.00m-185.00m).
16       Construction of RCC road Lutfor Rahman Patwaryi Bari in ward no – 09,at Lalmohan Pourashava.(Ch.0.00m-140.00m)
17       Construction of RCC road Start from R&H road to Munchi Barii in ward no – 01,at Lalmohan Pourashava.(Ch.0.00m-75.00m)
18       Construction of RCC road Start from Safia Khanom  Madrasha road to Abdus Sahid Master Bari in ward no – 04,at Lalmohan Pourashava.(ch.0.00m-106.00m).
19       Construction of RCC road Rashid Chokedar Bari in ward no – 08,at Lalmohan Pourashava.(Ch.0.00m-115.00m)
20       Construction of RCC road Start from   Nazir pur BC road to AFTAR Ali Hawlader Bari in ward no – 08,at Lalmohan Pourashava.(ch.0.00m-75.00m)
21       Construction of Palisiding work Nayani gram Mosque pond & Abul Hasem Bapary Bari Sarak in ward no – 04 at Lalmohan Pourashava.
22       Construction of RCC road start from Samaj Kallan Somity sarak to Moffazzal Mia bari sarak in ward no-05 at Lalmohan Pourashava (Ch 0.00m-86.00m).
23       Development of Thanar mor Market
24       Improvement of Sand filling work Govt Shahabajpur College Play Ground in ward no – 06 at Lalmohan Pourashava.
25       Construction of RCC Drain at Different ward Lalmohan
26       Construction of RCC Road start  from Sanirvar road to Khalak Commender bari in ward no-03 at Lalmohan Paurashava (Ch 0.00m-141.00m)
27       Improvement of Ahmad mia shah Central Eidgah in ward no-08 at Lalmohan Pourashava.
28       Construction of RCC road Dulamia Hang  Bari in ward no – 09,at Lalmohan Pourashava.(Ch.0.00m- 41.00m)
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  লোকাল রেভিনিউ 2017-18 পূর্বের বিভিন্ন সময়ে এডিপি থেকে টেন্ডারকৃত কাজের যাহা এডিপি থেকে বরাদ্দ পাওয়া যায়নি এমন ২০ টি কাজ।
 
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  IUIDP-2 2018-19
01       1. Construction of RCC Road Start From R&H Road to najir Ahmed Sawdagor Bari in ward No.05 at lalmohan Pourashava at chainage . 0.00 to 800.00m

2. Construction of RCC road Start form Amdad Ullah Moulavi Barui in ward No. 02 at lalmohan Pourashava at Chainage 0.00 to 160.00m Abu Taher Dilar Bari

3. Construction of BC road Start from R&H road to Soyed Hang Sarak in ward No. 05 at lalmohan Pourashava at Chainage. 0.00 at 200.00m

4. Construction of BC road Start from R&H road to Solayman hang Saran in ward No.05 at lalmohan pourashava at Chainage 0.00 to 195.00m+125.00m = 320.00m

5. Construction of BC road Start from R&H road to Motahar Master Sarak in ward No.05 at lalmohan Pourashava at Chainage. 0.00 to 205.00m

6. Construction of RCC road Start from lalmohan Mongal Sikdar road to Abul Kalamia Faraji Bari in ward no. 12 at lalmohan pourashava at Chainage. 0.00 to 180.00m

7. Construction of RCC road Start from Mohila College road to late Montaj Mia Bari in ward No. 03 at lalmohan Pourashava at Chainage. 0.00 to 500.00m

8. Construction of RCC road Start from Chaprashi Bari to Montaz Bapary Bari road via Hasham Hawlader Bari in ward No. 03 at Lalmohan Pourashava at Chainage. 0.00 to 360.00m

9. Construction of RCC road Start from R&H road to Hospital Gate (Both Side of Bridge) in ward no. 06 at lalmohan Pourashava at Chainage. 0.00 to 700.00m

10. Construction of RCC road Start from Janata Bank to Kamar Patty in ward No. 06 at Lalmohan Pourashava at Chainage. 0.00 to 360.00m

11. Re-Construction of BC road Start from Dakbanglo Bridge to Uttar Bazar Bridge in ward No. 08 at Lalmohan Pourashava at Chainage. 0.00 to 480.00m

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  Salami(Local Revinue) 2018-19
01       Construction of rest works of Multipurpose market (Part-01) at ward no-06 in Lalmohan Pourashava
02       Construction of rest works of Multipurpose market (Part-02) at ward no-06 in Lalmohan Pourashava.

 

03       Construction of rest works of Multipurpose market with 01 nos Toilet (Part-03) at ward no-06 in Lalmohan Pourashava

 

04       Construction of rest works of Multipurpose market with 01 nos Toilet + (Part-04)  at ward no-06 in Lalmohan Pourashava
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  LMIDP/LGED (GOB) 2018-19
01       Improvement Bridge Approach by BC of 66.00m Long RCC Girder Bridge on Bajlur Rahman road to ward no Connecting Bridge in ward no 05 including 3.00mx2.00m RCC Box for Under pass (ID NO: 5798170013)
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  IUIDP-2 ,LGED (GOB) 2018-19
01       01.Rehabilitation of Road starting from R&H (Mangal Sikder) Road to Katrtar Kachary sarak (Ch 00m-800m) at ward no. -02 under Lalmohan Pourashava, District: Bhola
02       02.Rehabilitation of Road starting from R&H (Mangal Sikder) Road to Katrtar Kachary sarak (Ch. 800m-1225m) at ward no. -02 under Lalmohan Pourashava, District: Bhola
03       03.Rehabilitation of Road starting from R&H to Karim road (Ch 00m-920m) at ward no -04, 05 under Lalmohan Pourashava, District: Bhola
04       04.Rehabilitation of Road starting from R&H to Karim road to Kartar kachary (Ch 00m-1310m) at ward no -03, 04 under Lalmohan Pourashava, District: Bhola
05       05.Rehabilitation of Road starting from R&H to Balur char Mayar char sarak (Ch 00m-950m) at ward no -01under Lalmohan Pourashava, District: Bhola
06       06.Rehabilitation of Road starting from R&H to Balur char Mayar char sarak (Ch 950m-1500m) at ward no -01under Lalmohan Pourashava, District: Bhola
07       07.Rehabilitation of Road starting from Shabaspur College road to Hospital Gate Via mobarak ali hang road (Ch 00m-1150m) at ward no -06, 07 under Lalmohan Pourashava, District: Bhola
08       08.Rehabilitation of Road starting from Modhu Chanda sarak to Shabaspur College sarak (Ch 00m-520m) at ward no – 07 under Lalmohan Pourashava, District: Bhola

 

09       09.Rehabilitation of Road starting from Motahar Uddin road to Noth side of Peskar Hawla GPS (Ch 00m-880m) at ward no – 09 under Lalmohan Pourashava, District: Bhola
10       10.Improvement of Road starting from Nazirpur road to Khal par Residential area (Ch 00m-445m) by Bituminus Dense Carpeting (DC) Ward no- 08 under Lalmohan Pourashava, District: Bhola
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  ADP(GOB) 2018-19
01       01.Construction of RCC road Start fromTersi pool sarak toWest side 0f fish stall north side of kitchen market in ward no – 06   under Lalmohan Pourashava, District: Bhola .(ch.0.00m -90.00m)
02       02.Construction of Partytion wall for Multi purpose Market in front of water development Board  in ward no – 06  under Lalmohan Pourashava, District: Bhola .

 

03       03.Clearing and grubbing by removal and disposal of Sajib wazed joy poura digital park RCC- U drain & imprubment of katcha drain in ward no. 02,03,04,06,09 at Lalmohan Pourashava. District: Bhola

 

04       04.Improvement of Earth filling work college para sarak  in ward no – 06 at Lalmohan Pourashava, District: Bhola.(ch.70.00m-282.00m =212.00m)

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  ADP (Special,lump sum) 2018-19
01       Repairs of maintainance works of pourabhaban Boundary wall with supplying Fumiture of Lalmohan Pourashava Bhola
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  Own Fund 2018-19
01        01.Re-placement of street lighting & Line extension in poura area at Lalmohan Pourashava
02       02.Improvement of Earth filling worksstart  from Moizuddin Hang bari Rcc sarak to Abdul Motaleb master at ward No-01 in Lalmohan pourashava
03       03.Supplying best quality armless visitor chair at Lalmohan pourashava

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  Own Fund 2018-19
01       01.Repairing of Ranger Jeep car with supplying  & fitting machinary etc.
02       02.Improvement of sand filling at Lalmohan High School field  at ward No-04 in Lalmohan pourashava.
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  ADP /Local(Revinue) 2019-20
01       01.Construction of Foara in front of Alhaz Nurul Islam Chowdhury Kaowmi Madrasha, Orphanage field in ward no 01 at Lalmohan Pourashava

 

02       02.Supplying Made & Fitting fixing of Poura Holding digital number plate in every poura holding at Lalmohan Pourashava .

 

03       03.Construction of Retaining Wall in front of Launch Ghat Bridge Approach in ward no 05 at Lalmohan Pourashava (12.00m) Rcc road.

 

04       4) Improvement of Earth filling work start from Boksi bari sarak to South side of Khal (Culvart) at ward no 11 in Lalmohan Pourashava
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  ADP 2019-20
01       a)  Construction of RCC U Drain Start from Al-Hazz Nurul Islam Chowdhury Sarak to Al-Hazz Nurul Islam Chowdhury Islamic Complex in ward no-01 at Lalmohan Pourashava (Ch 0.00m-  150.00m),  b)Improvement of Earth & Sand Filling work Al-Hazz Nurul Islam Chowdhury Islamic Complex in ward no-01 at Lalmohan Pourashava, c) Stabilistment of Fountain Al-Hazz Nurul   Islam Chowdhury Islamic Complex in ward no-01 at Lalmohan Pourashava, d) Supplying Fitting & Fixing Stainless Steel Railing, Varanda raling Madrasha Bhaban Al-Hazz Nurul Islam   Chowdhury Islamic Complex in ward no-01 at Lalmohan Pourashava, e) Supplying and Fitting Fixing Water Proof LED Light Sajib Wazed Joy Digital Park in ward no 06, at Lalmohan Pourashava

 

 

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
   GOB (Dengu) 2019-20
01       Supplying ,Spreading,Spry etc.for mosquito & its larva destruction with Fogger medicine and supplying necessary equipment/instrument for cleaning drain,road & disposal of gurbage etcby emergency basis at different wards at Lalmohan pourashava.Dis.Bhola (Dengu)
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  Own( Revenue) 2019-20
01       Re-placement of street lighting in Poura area at Lalmohan Pourashava
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  Own 2019-20
01       1. Construction of Gate AL –Haz Nurul Islam Chowdury sarak at ward No-01 in Lalmohan Pourashava

02)Improvement of Earth  Filling work strat from Mofiz Uddin Hawlader sarak to West Direction  of Sub- reg. office earthen  road a at ward No-01 in Lalmohan Pourashava

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বাস্তবায়িত কাজের বিবরন
  IUIDP-2 (LGED) 2019-20
        1. Construction of RCC Road starting from  Kamar Patty to Bussar Stall at Lalmohan Bazar Truck   Stand ( (Ch.145m-285m) at ward No. 06, under LalmohanPourashava, District: Bhola
        2 Construction  of RCC Road starting from  Kamar Patty to Bussar Stall at Lalmohan Bazar Truck  Stand (Ch.00 m-145m) at ward No. 06, under LalmohanPourashava, District: Bhola
        Construction of RCC Road start  Akhra Bari Sarak to Ramkrisna House  (Ch. 00m-212m) at ward No. 06.      under LalmohanPourashava,  District: Bhola
        . Construction of RCC Road start from Ramkrisna House to Uttar Bazar Mosque (Ch. 00m-129m) at ward No. 06,  under LalmohanPourashava,  District: Bhola
           Construction  of RCC Road  side Weeding R&H  Road side  Diffrant area (Ch. 00m-150m) at     ward No. 02 & 04, under LalmohanPourashava,  District: Bhola
         . Construction of RCC Road start from Nazirpur BC Road to KadirZamaderBari,HatemMawlanaBari,Shafiq Mia  &MozibalHaque Master Bari (Ch. 00m-437m) at ward No. 03, under LalmohanPourashava,  District: Bhola
          Rehabilitation  of  Road starting  from SafiaKhanomMadrashasarak  to Sanivarsarak  Via. H amid Hang Sarak  by  Bituminous Dense  Carpeting (DC)  (Ch. 00m -720m) at ward No. 04, under LalmohanPourashava,  District:   Bhola
        1. Rehabilitation  of  Road starting  from Sanivarsaraksarak  to AbulKalam Master Bari  Via. FullbagichaSarak by   Bituminous Dense  Carpeting (DC)  (Ch. 00m -935m) at ward No. 05, under LalmohanPourashava,  District: Bhola
         2. Construction of RCC Drain Lalmohan Uttar Bazar Poura Grave Yeard  (Ch. 00m-150m & Ch.00m-50  m) at ward No. 06 & 04, under LalmohanPourashava,  District: Bhola
        .Construction  of RCC Road starting from  Sahbajpur College Sarak to  Bagha Bari Via. Zannat-UL-Mawa Mosque (Ch.00m-150m) at ward No. 07,  under LalmohanPourashava, District: Bhola

 

   

ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  ADP/Local Revenue 5/2019-20
01       1) Construction of  Lalmohan Poura Auditoriam North Bazar at ward No-06 in Lalmohan Pourashava(Patr-1), (Part-2), (Part-3)
02       Construction of Rcc road start from Al-Haz Nurul Islam Chowdhury sarak to Al-Haz Nurul Islam Chowdhury Islamic Complex ward no-01 at Lalmohan Pourashava (Ch.0.00m-100.00m)
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  ADP & Local Revenue 6/2019-20
01       Construction of Retaining wall Lalmohan Poura Shisu Park Pond (North side-60m) in ward no-12 at Lalmohan Pourashava (ADP)
02 (Corona)GOB     Clearing and grubbing by removal and disposal of RCC U Drain, Sajib Wazed Joy Poura Digital Park & Improvement of Katcha Drain in ward no-02,03,06,04,09,12 at Lalmohan Pourashava (Corona)
03       Construction of Road Name Plat Different area & Different ward at Lalmohan Pourashava (Revinue)
04       Re-Construction of RCC Road Mohsin Talukder Sarak in ward no-05 at Lalmohan Pourashava (Ch 0.00m-200.00) (Revinue)
05       Supply Electric Goods such as bulbs wire and other material etc at Different ward in Lalmohan Pourashava (Revinue)
ক্রমিক নং প্রকল্পের নাম অর্থ বছর বরাদ্দের পরিমান

( লক্ষ টাকায় )

বাস্তবায়িত কাজের বিবরন
  Covid-19,(ADP Spec.) 2019-20
        Procuring, Supplying, Distributing maintaining various emergency corona purpose material such as Soap, Bleeching, Plastic water Tank, hand sanitizer, musk hand wash, Hard work, Tissue, spray machine. spray bottle hand gloves, corona eye glass  by 12 nos of by Direct procurement method (Corona-19)

 

লালমোহন পৌর এলাকায় বিদ্যুৎ লাইনের বিবরন।

 

লালমোহন পৌরসভায় ১২ টি ওয়ার্ডে সর্বমোট পল্লী বিদ্যুতের গ্রাহক লাইন ১৮৬.০০ কিঃমিঃ

পিলার ৩৭০০.০০ টি, গ্রাহক ১২৪৩২ জন পৌরসভার সড়ক বাতি ৯২০ টি।

Improvement of Roads

Sl no Name of Scheme Unit Length

(m)

Width

(m)

Remarks
01 Re-Construction of RCC Road starting from R&H to Munchi bari sarak via Hazari bari sarak at ward no 01 in Lalmohan  Paurashava (Ch 0.00m-550.00m m 550.00 2.75
02 Construction of RCC Road start from R&H Road to Hasan hang sarak via Eng Abul Kasem house at ward no 01 in Lalmohan Paurashava (Ch 0.00m-430.00m) m 430.00 2.75
03 Construction of RCC Road starting from R&H to Amdadullah Mowlavi bari at ward no 02 in Lalmohan  Paurashava (Ch 0.00m-280m) m 280.00 3.00
04 Construction of RCC Road and Retaining wall starting from R&H Road to Abu Taher Dealer bari at ward no 02 in Lalmohan  Paurashava (Ch 0.00m-230.00m) m 230.00 3.00
05 Construction of RCC Road starting from Nobab ali hang sarak to Solayman hang sarak via Fena bari at ward no 03 in Lalmohan  Paurashava (Ch 0.00m-620.00m) m 620.00 2.50
06 Construction of RCC road start from Nowab ali hang sarak to Montaz uddin Bepary bari sarak at ward no 03 in Lalmohan  Paurashava (Ch 0.00m-165.00 m 165.00 3.00
07 Construction of RCC Road Nowab ali hang bari with Retaining wall at ward no 03 in Lalmohan  Paurashava (Ch 0.00m-100.00m) m 100.00 2.50
08 Construction of RCC Road start from Karim road to East & West side at ward no 04/05 in Lalmohan Paurashava (Ch 0.00m-620.00m) m 620.00 2.50
09 Construction of RCC Road Karim Road to Rafiqe house via Ziaul Haque hang house (Ch 0.00m-795.00m) at ward no 05 in Lalmohan Paurashava m 795.00 3.00
10 Construction of RCC Road Anichal Mia bari to Ziaul Haque hang bari (Ch 0.00m-320.00m) at ward no 05 in Lalmohan Paurashava m 320.00 3.00
11 Construction of RCC Road Haque Super Market (Ch 0.00m-450.00m) at ward no 05 in Lalmohan Paurashava m 450.00 3.00
12 Construction of RCC Road Langal Khali Bridge to Nurul Islam house road & block East side of Sattlement Office at ward no 05 in Lalmohan Paurashava (Ch 0.00m-350.00m) m 350.00 3.00
13 Construction of BC & RCC Road Muktizuddha Avenue (Ch 0.00m-1270.00m) m 1270.00 10.00
14 Construction of RCC Road & Retaining Wall Start from Nurunnabi Chowdhury sarak to Master para sarak via Chandra para at ward no 06 in Lalmohan Paurashava (Ch 0.00m-250.00m) m 250.00 3.00
                15 Construction of  RCC Road & Retaining wall Karim Road to Nurunnabi Chowdhury Bypus sarak (Datta para Road) at ward no 06 in Lalmohan Paurashava (Ch 0.00m-370.00m) m 370.00 3.66
16 Construction of RCC Road start from Bhola-Charfession R&H  to Delowar Rahman Arotdar bari at ward no 06 In Lalmohan Paurashava (Ch 0.00m-200.00m) m 200.00 3.00
17 Construction of RCC Road Aziz Pandith Road (Ch 0.00m-560.00m)  at ward no 07 in Lalmohan Paurashava m 560.00 3.00
18 Construction of RCC Road west side Rashid diller bari (Ch 0.00m-350.00m)  at ward no 07 in Lalmohan Paurashava m 350.00 3.00
19 Improvement of BC Road Jubon Ali Hang bari toJamader bari (Altaf Master bari) (Ch 0.00m-315.00m)  at ward no 07 in Lalmohan Paurashava m 315.00 2.00
20 Construction of RCC road start from College para Abdur Rob Sir house to Charcakina Road via Sakumuddin hang bari (Ch 0.00m-750.00m)  at ward no 07&10 in Lalmohan Paurashava m 750.00 3.00
21 Construction of RCC Road Mohammad Hossan khan road to BRDB at ward no 08 in Lalmohan Paurashava (Ch 0.00m-350.00m) m 350.00 3.66
22 Construction of RCC road with Drain City Cell Tower road start Mohammad hossan Khan road at ward no 08 in Lalmohan Paurashava (Ch 0.00m-250.00m) m 250.00 3.00
23 Construction of RCC road with Drain  Saker Dokan to South side Khal at ward no 08 in Lalmohan Paurashava (Ch 0.00m-230.00m) m 230.00 2.50
24 Construction of RCC road with Drain Mohammad Hossan Khan sarak to Khal via Khokan Golder field at ward no 08 in Lalmohan Pourashava (Ch 0.00m-240.00m0 m 240.00 2.50
25 Construction of RCC road Khan Saheb sarak to Alauddin & Abdul Haqe mia bari ward no 08 in Lalmohan Pourashava (Ch 0.00m-340.00m0 m 340.00 2.50
26 Construction of Ramiz member bari Road & Pond Retaining wall (Ch 0.00m-370.00m) at ward no 09 in Lalmohan Paurashava m 370.00 3.00
27 Re-Construction of BC road Gani mia Matbar Bazar to north side Sarder house (Ch 0.00m-210.00m) at ward no 10 in Lalmohan Paurashava m 210.00 3.00
28 Construction of RCC Road Gani Matabbar Bazar to Last Point via Bayati bari (Ch 0.00m-220.00m) at ward no 10 in Lalmohan Paurashava m 220.00 3.00
29 Construction of RCC Road Charsakina Bazar to Mosque & Charsakina North side Paura Border at ward no 10 in Lalmohan Paurashava (Ch 0.00-320.00 m 320.00
30 Construction of RCC Road start from Aslam Panchayet sarak to South side of Culvert at ward no 11 in Lalmohan Paurashava (Ch 0.00m-280.00m) m 280.00 3.00
31 Construction of RCC Road start from Aslam Panchayet sarak to Chan mia Sawdagor sarak via Hazi bari at ward no 11 in Lalmohan Paurashava (Ch 0.00m-550.00m) m 550.00 3.00
32 Construction of RCC Road start from Chan mia Sawdagar sarak to Dalal bari at ward no 11 in Lalmohan Paurashava (Ch 0.00m-370.00m m 370.00 3.00
33 Construction of RCC Road start from Nowab ali hang sarak to Pike bari sarak at ward no 12 in Lalmohan Paurashava (Ch 0.00m-380.00m) m 380.00 3.00
34 Construction of RCC Road start from Nowab ali hang sarak to Abdul Haqu mia sara at ward no 12 in Lalmohan Paurashava (Ch 0.00m-400.00m) m 400.00 3.00
35 Construction of RCC road start from  Nowab ali hang sarak to Rahim ali sarak at ward no 12 in Lalmohan Paurashava (Ch 0.00m-200.00m) m 200.00 3.00
36 Construction of RCC road start from Chan mia Sawdagar sarak to Momotazia Govt Primary School sarak via Golder bari Mosque at ward no 12 in Lalmohan Paurashava (Ch 0.00m-450.00m) m 450.00 3.00
37 Construction of RCC Road start from Mofizul Islam sarak to Momotazia Govt Primary School via Hallypad at ward no 12 in Lalmohan Paurashava (Ch 0.00m-930.00m) m 930.00 3.00
38 Construction of RCC Road Mirdha bari to Pastan bari, Mal bari with Retaining wall at ward no 12 in Lalmohan Paurashava (Ch 0.00m-620.00m) m 620.00 2.50

List of Proposed Others Schemes

Sl no Name of Scheme Unit Quantity Remarks
01 Construction of Fountain on Lalmohan Square at Lalmohan pourashava. nos 01
02 Construction of Stadium at ward no 05 in Lalmohan Paurashava nos 01
03 Construction of RCC Ghatla different ward in Lalmohan Paurashava nos 30
04 Constructon of Public Toilet different ward in Lalmohan Paurashava nos 20
05 Construction of Modon Mohon Zew Mandir at ward no 06 in Lalmohan Paurashava nos 01
06 Construction of Sheikh Rasel Paura Shisu & Binodon Park at ward no 12 in Lalmohan Paurashava nos 01
07 Construction of Ozu Khana Different Mosque Different ward in Lalmohan Paurashava nos 20
08 Improvement of Paura Interior Decoration with Furniture in Paura Office nos 01
09 Construction of Paura Fish Market North Bazar in Lalmohan Paurashava nos 01
10 Construction of Paura Market Langar Khali Bazar at ward no 05 in Lalmohan Paurashava nos 01